亚洲国产欧美在线人成|国产精品污片免费下载|久久精品国产只有精品6|日本欧美中文字幕精品亚洲|最新中文无码字幕在线热播|香港三级日本三级久久不卡|人妻丰满熟妇无码区乱com|人妻无码中文字幕免费视频蜜桃

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1995

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
襄樊市| 儋州市| 大邑县| 凤凰县| 界首市| 边坝县| 房产| 峨眉山市| 牙克石市| 商城县| 讷河市| 松滋市| 布尔津县| 泽库县| 潼南县| 富顺县| 锦屏县| 民丰县| 轮台县| 旅游| 二连浩特市| 太仓市| 通河县| 天等县| 苗栗县| 安龙县| 沙河市| 鲁山县| 旬邑县| 阿城市| 秦皇岛市| 新和县| 石家庄市| 郯城县| 伊春市| 商都县| 融水| 新河县| 都匀市| 旬阳县| 安岳县|